Eight months after demolition: New bridge construction starts in Großenhain
Fast start to construction after surprising demolition: The new B101 bridge is now being built in Großenhain - and traffic should be moving again as early as 2026.
Powěsće so přeprošuja...
Fast start to construction after surprising demolition: The new B101 bridge is now being built in Großenhain - and traffic should be moving again as early as 2026.
Following the partial collapse of the Carola Bridge in Dresden, numerous structures in Saxony were investigated. The bridge in Großenhain was closed and has since been demolished. Now the new construction is beginning.
The load-bearing capacity of the bridge on the B101 is so endangered that demolition is the only option. Work begins just one day after the inspection.
The load-bearing capacity of the bridge on the B101 is so endangered that demolition is the only option. Work begins just one day after the inspection.
The load-bearing capacity of the bridge on the B101 is so endangered that demolition is the only option. The closure affects not only car traffic but also rail traffic.